advanta

Home → Module Library

The operational capability layer of the Legal AI OS.

Modules are the institutional artefacts a legal function runs to advance maturity, produce Defensibility evidence, and operate on canonical ground in front of a regulator or a board. Anchored across the 8 Pillars and 6 Operating Layers. Methodology-versioned. Editorially independent.

3 Modules

Module GOV-09 sigil: Governance pillar, Strategy layer, maturity bands 1 to 3.Deterministic sigil for Module GOV-09. The Pillar geometry encodes Governance (Pillar 4); the top-right marker S encodes the Strategy layer; the baseline meter encodes maturity bands 1 to 3.S
P4· L-E

GOV-09

AI Evaluation Harness Specification

Specifies the standardised evaluation methodology, test suites, and pass thresholds for all AI tools before deployment and during ongoing operation.

Module

Initial evaluation 3–5 business days per tool (Tiers 0–2); 7–10 business days for Tier 3–4 including agentic supplement. Ongoing monitoring is continuous.

View →

Module GOV-10 sigil: Governance pillar, Strategy layer, maturity bands 1 to 3.Deterministic sigil for Module GOV-10. The Pillar geometry encodes Governance (Pillar 4); the top-right marker S encodes the Strategy layer; the baseline meter encodes maturity bands 1 to 3.S
P4· L-E

GOV-10

AI Lifecycle Operating Manual

Maps the complete AI tool lifecycle from identification through retirement, integrating every governance module into a single coherent operational sequence.

Module

Stage 1–4 (Tiers 0–2): 2–5 business days per tool. Stage 1–4 (Tiers 3–4): 5–10 business days. Stage 5–6: Ongoing. Stage 7 standard: 2–4 weeks. Stage 7 emergency: 24–72 hours active response.

View →

Module GOV-11 sigil: Governance pillar, Strategy layer, maturity bands 1 to 3.Deterministic sigil for Module GOV-11. The Pillar geometry encodes Governance (Pillar 4); the top-right marker S encodes the Strategy layer; the baseline meter encodes maturity bands 1 to 3.S
P4· L-G

GOV-11

AI Incident Disclosure Standard

Governs the organisation's obligations and procedures for disclosing AI incidents to clients, regulators, and professional bodies.

Module

Disclosure decision: 4–8 hours per incident; regulator notification preparation: 1–3 business days; client disclosure drafting: 1 business day per affected client.

View →

Advisory

The full operating system in one Programme.

Programme Design and Strategic Retainer engagements operate the canonical Module sequence end-to-end — Defensibility evidence produced, Maturity progression evidenced quarterly, methodology version pinned. The Module Library is the artefact; the engagement is the operating posture.

View Engagement Models